On the provided production sheet, 145-800g block loaves, 45-800g flour loaves, 7-800g tin viennas, 7-800g high tin, 6-550g cobs, 12-550g viennas, 6-550g pipe, 2-550g farmers, 10-450g sticks, 6-400g tin viennas, 6-400g flours and 8-400g blocks are scheduled to be made. Therefore the exact total dough weights (TDW) by the information provided will be,
145 x 0.800=116
45 x 0.800=36
7 x 0.800=5.6
7 x 0.800=5.6
6 x 0.550= 3.3
12 x 0.550=6.6
6 x 0.550=3.3
2 x 0.550=1.1
10 x 0.450= 4.5
6 x 0.400=2.4
6 x 0.400=2.4
8 x 0.400=3.2
Subscribe to:
Post Comments (Atom)
1 comment:
How do we post the spread sheet?
Post a Comment